Finishing trimming more than these home improvement details do not ignore

When is the renovation finished? When the decoration company's construction workers on the site are removed, does this mean that the decoration is over? not really! There is still a lot of work to do at this time. In order to avoid the decoration quality problem in the future, please do not ignore some details when finishing the decoration.

First, a detailed inspection of project quality inspection

The types of work for home decoration include hydraulics, electricians, bricklayers, carpenters, and oil workers. After the completion of this series of projects, the basic decoration part has come to an end and the finishing work has begun.

Inspector Lu Luanyuan introduced that after the renovation must pay attention to the acceptance of interior decoration project quality. "Although after each type of work is completed, the decoration company's construction supervisor will accept the project conditions. However, to prevent accidents, the decoration owner should find a professional house inspection company or an experienced person to make a careful acceptance one by one. There is no problem, then with the decoration company to do the final account settlement."

Designer Liu Yang said: "After the completion of the renovation, the decoration industry will mainly pay close attention to refunding the decoration deposit and decoration worker's certificate deposit and other expenses. Secondly, when adding new furniture, the interior shall protect the finished product, avoid hard objects, wall, The effect of repair after damage to the ground, doors, etc. is much poorer than that of the original decoration, and it should be carried out lightly when moving. Large furniture must be planned beforehand and then moved. It is best to disassemble the parts and move them in before assembly. ”

  

Second, keep the remaining material in case of need

A lot of decoration owners may have such experience. For the rest of the materials after the renovation, most people threw them and gave them away. However, if you accidentally bump into a move, such as scratches on the wall or natural cracking of the wall, it is troublesome to have no remaining material on hand.

“Generally, in order to prevent future wall cracking during the renovation, the owner should allow the oilman to repair the wall once again. The owner himself should also keep a small amount of putty and latex paint for a period of time after renovation to prepare for the unexpected. "Designer Zhang Haizhou said.

Decoration designer Li Dongze stated that tiles, baseboards, and other materials should also be kept in small amounts.

These materials can be repaired in time after partial damage to indoor walls, floors, etc.

"In addition, the preservation method should also pay attention to, such as latex paint, it is best to use within six months after opening, after the shelf life, can not be used; tiles are best stored in a relatively dry place to prevent moisture discoloration; and the best wood material Wrap a newspaper that absorbs moisture," said Li Dongze.

  

Third, the decoration voucher well kept evidence of rights protection

Most of the decoration company's warranty is limited by the number of years, usually 3 to 5 years. The certificate for this period of time is usually the contract or related receipt when the decoration company signs the bill. Without these credentials, it is likely that the decorating company will reject the free warranty.

Liu Yingjian, the decoration designer, said: “The decorating certificate must be kept well by the owner of the decoration. First, there are detailed product information on the contract, and once the maintenance is needed, the information can be found directly. In addition, the contract, order, etc. also marked some service commitments and warranty period. Matters such as what fees are charged after the warranty period are important proofs of human rights. Moreover, the design drawings of the water circuit also need to be retained. When the hydropower fails, maintenance personnel can find the cause and fault according to the drawings. Point, and in the future want to drill on the wall without worrying about damaging the water circuit."

  

Editor's summary: The acceptance after the completion of renovation is very important. One is to check the decoration quality of the decoration company, and the other is to avoid unnecessary trouble for future life. Therefore, the final payment is paid to the other party only after the acceptance has passed.

Decoration experience Bay window decoration entrance decoration decoration company decoration design paint latex paint floor tile tile adhesive floor tile ld tile

Powder AC

Powder AC,Activated Carbon Water Filter ,Activated Charcoal Filter ,Carbon Block Water Filter

Catalyst & Active Agent Co., Ltd. , http://www.nbteethwhite.com

Posted on