Autumn Home Improvement Collection

"Jin 9 Silver Ten", as the decoration season, the heads of households all hope to decorate and use a new home to welcome the arrival of the new year. However, the difference between the autumn and the weather in Other seasons, if not a little attention, it is easy to bring a lot of trouble to the decoration.

Autumn decoration book, let you avoid the mistakes to grasp the main points, happy to stay in a new and comfortable home.

Autumn decoration - want to go article

Jin Hao:

The main components of paints and waterproof materials are mostly resinous organic polymer compounds, which contain a large amount of volatile solvents. When used, it is often necessary to adjust the viscosity with a thinner to facilitate the construction. These thinners are highly volatile and diffuse in the air, making them the culprit in worker poisoning during construction.

Nowadays, the temperature changes frequently and the human body's immunity becomes less powerful in such an environment. In addition, a variety of pathogenic bacteria and viruses are easily recovered in mild weather. In addition, most workers are provided with food and accommodation on site, and food and tableware are hygienic and the on-site environment is prone to disease epidemics.

Wood rake:

Do not rush to repair the seasonal problems of the house. In summer, the humidity in the air is large, and the moisture contained in walls, floors, and wooden furniture is relatively large; in winter, the situation is reversed. At this time, due to seasonal changes, there are some problems in the temperature and humidity, such as wood floor shrinkage, the gap between the board and the board is increased, the wall surface and the door frame may be different due to the difference in the shrinkage of the two different materials. Gap, these are all normal phenomena that occur during the season transition.

In addition, if the wall is cracked, the moisture in the wall is gradually evaporating. If it is repaired at this time and the water continues to evaporate, the wall may continue to crack. Wait until the water in the wall is suitable for the external climate. Then perform a one-time repair, this will be more satisfactory decoration effect.

Avoid placing wood in the vents. The climate in the autumn is dry, and the wood is placed at the vents, which can easily cause the moisture in the wood to be quickly lost. The surface is cracked and small cracks appear. Therefore, for high-grade panels such as beech to do oil sealing, lock the moisture in the wood will not be lost.

Otter:

During the renovation, it is necessary to prevent damage to the waterproof layer of the kitchen and toilet. At the same time, it is necessary to carefully check whether the waterproof layer is in place and whether it has been damaged. Otherwise, it should be repaired. After the repair, the water injection test should be performed. If there is any change in the location of the kitchen toilet, it is necessary to re-do the waterproof layer. Some people changed the water supply and heating system without permission in order to facilitate the decoration, resulting in a lot of flooding. To avoid the use of poor water quality pipe fittings caused by running water.

Wallpaper should be dried naturally. Now home decorating the walls, mostly brush paint or paste wallpaper, the climate is dry in autumn, the wallpaper is usually soaked in water before paving, and then brushing paste.

Fire:

Pay attention to the use of fireproof materials in the decoration. All decorative materials such as wood, carpets, fabrics, and paints are flammable materials. For this reason, the state has established strict standards and must choose matching decorative materials according to the standard grade requirements. Indoor ceilings should be made of flame-proof materials, and walls, floors and grass-roots floors should be fire-resistant or hard-to-use to minimize the risk of fire. The wood used to make kitchen utensils must be fireproofed.

Bandits:

At present, due to the brutal renovation of the project caused a lot of hidden problems in quality, these hidden dangers include: casually wear holes in the load-bearing wall, remove the wall of the balcony doors and windows. Expand the size of existing doors and windows or build additional doors and windows. Randomly increase the static load of the building surface; install indoor walls or overloaded ceilings, install large-scale lamps and ceiling fans. Arbitrary planing cutting roof, drilling, cutting off the building reinforced steel. The balcony function is artificially amplified and the overload phenomenon is serious. Directly bury electric wires or change lines, as well as water, heating, electricity, gas and other residential auxiliary facilities without wearing pipes.

Fall Decoration - Misunderstandings

"Avalanche"

Ceiling: The material of the ceiling is mainly wood (also known as splint), gypsum board, and silicate board. The cost price of these three materials are similar, but the material properties and process requirements are quite different. There is a misunderstanding that there is no tendency for the fall to be damp in the summer, so wood and gypsum board are used as ceiling materials to reduce the decoration process. In fact, due to the dry climate in autumn, the quality of silicate plates that are not easily cracked should be relatively guaranteed.

Flooring: often after the owner of the fall decoration, due to wood floor shrinkage, board seams increase, different materials interface seams and other reasons, many times to repair the floor, and repeated repairs are not effective. This is due to the fact that the autumn climate is dry and the temperature changes frequently. Water volatilization and material shrinkage can cause cracks and crevices of varying degrees, which is a normal physical change. After the cold and warm changes have been experienced in the spring of the following year, the cracking and deformation problems have stabilized and repaired once.

"Empressed on all sides"

Wall: After the wall paper that has just been attached to the wall or the wall cloth has been blown by the wind, it begins to have problems of partial bulging, tilting, and even cracking and falling off. This is different from the “ventilation” of wallpapers in the summer. The autumn decoration is not only to “replenish water” for the wallpapers, but also to let the wallpapers or wallcloths stick naturally and not to “ventilate”. In the fall decoration, wallpaper and wall cloth must be fully immersed in water before paving, and then brushing and plastering. After the paving, you can't open doors and windows like the summer, let the walls dry quickly. Because doing so is very easy to make good freshly paved wallpaper was blown away, so that water loss deformation. Therefore, after applying good wallpaper and wall covering in the autumn, the owner needs to close the doors and windows for 1 to 2 days, waiting for the wall to dry naturally.

Hue: As the weather gradually cools, you will unknowingly enjoy some warm colors. In this season, renovations were made, and impulses were used to create a warmer wall tone. Once in spring and summer, warm shades are not suitable.

"Jianglang's material' do"

Wood: In the autumn, wood is not easy to get wet, but wood must be kept in a ventilated place in the same way as in the summer. Otherwise, it will be too late if the wood is cracked or the wood line shrinks. Because the moisture content of the wood is adapted to the external climate, if the wood is placed on the tuyere and dried, the moisture in the wood will be quickly lost, and the surface will crack and cracks will appear. Therefore, after the timber is shipped to the decoration site, avoid placing it at the vent.

Coatings: In order to make the paint dry as quickly as possible, so "my family opened the doors and windows," want ventilation and ventilation as soon as possible. As everyone knows, this will cause the paint to quickly lose water and shrink. In the autumn decoration, avoid drying the paint and cause water loss. It should be dried naturally.

Fall Decoration - Suggestion

Four preparations

Psychological preparation: renovation, for many home buyers to buy a new house, get the key to a new house, more exciting and novelty, but neglected the difficulty and complexity of the renovation project. Therefore, before the renovation, decoration must not be taken lightly. It is a very easy thing to think that there must be enough psychological preparation to meet the various difficulties and problems that may arise during the renovation. Only in this way can we see the move in the decoration process. Specifically, it is to achieve "a high degree of attention, adequate preparation, correct attitude, and precautions."

Knowledge Preparation: Knowing yourself and knowing yourself is a commonplace. Before decorating, you should start with home improvement knowledge and use your knowledge to arm yourself. This will be a pitfall that may arise when you face decoration companies, building material traders, and decoration workers in the future and deal with various types of emergencies. The favorable guarantee of the problem. Internet search information, bubble home decoration forum, look at friends home decoration diary, consulting friends with decoration experience, visit the model room is a good way.

Capital preparation: Renovation is a big investment for most families, so budget should be prepared. In general, the total cost of renovation should be 10% to 20% of the home price. During the renovation process, the detailed expense plan should be listed as far as possible for each detail. If the budget plan that exceeds the plan is to be resolutely rejected, the decoration cost will eventually exceed the expected amount.

Duration preparation: Decoration relates to the future quality of life of a family. It is always necessary to focus on construction on the spot to be able to feel at ease. This is an irreconcilable contradiction for office workers. Therefore, how to properly arrange the construction period is a matter to be prepared in advance. For example, couples may use holiday vacations, leave leave and longer statutory holidays.

Five choices

Choosing a company: Choosing a suitable decoration company is very important. If you choose the wrong decoration company, decoration will be troublesome. Many acquaintances were asked to hear more people's opinions.

Choose the designer: The designer is the soul of the entire decoration process. The good designer must communicate through multiple exchanges to determine whether the designer is responsible from the details of the exchange; from his previous design case, he judges whether the designer has a good aesthetic. The concept and excellent spatial imagination ability can transform the idea of ​​the head of the household into a viable construction plan after extensive preservation.

Choosing a design plan: A good design plan is determined after the head of household and the designer have fully communicated with each other. The household mainly tells the designer their own vague ideas, and the designer converts it into a design plan according to their own professional knowledge and design experience. The design plan should pay attention to some special details, such as the occupation of the head of the household, the number of families, personal preferences, pets, living habits, avoidance issues and religious beliefs, etc. These details may affect the choice of design options. In short, the plan must meet market trends, individual needs, and the characteristics of the home.

Choosing the main material for decoration: The main material for decoration is a matter of seeing people, benevolent, and wise. Each person chooses the right thing according to his preferences, budget, etc. It is difficult to copy other people's programs. However, there is a basic principle for reference, that is, starting from the quality of the decoration project and the quality of environmental protection, choose the main material that meets the requirements for quality clearance, affordable price, and environmental protection. Xiaobian’s advice to everyone is to choose discounted products from well-known brands.

Select supervision program: This is relatively simple, according to the actual situation, the choice of decoration company supervision or agency supervision can be. Of course, if you have time and expertise, your supervision will certainly be more comfortable and save money.

Two guarantees

Project Quality Assurance: Reference can be made to the quality acceptance specifications of various decoration engineering projects for acceptance of the results of home improvement. If there is any problem, it should be reworked or repaired in time. At the same time, the house should be tested for a period of time to ensure that there are no engineering problems.

Environmental protection quality assurance: You can ask relevant units to carry out environmental quality testing to understand whether formaldehyde or other harmful substances are excessive. If there are problems, we should promptly carry out home improvement and pollution control. In general, newly renovated homes cannot be accommodated immediately. They must be ventilated for a period of time to allow harmful gases to disperse and the concentration to be suitable for living.

Pre-decoration Entrance decoration Children's room decoration Decoration design Wallpaper Window coating Paint gypsum board Ceiling ceiling price Decoration decoration company How do you do? Bathroom decoration model room decoration cost budget decoration model room family decoration model room housing decoration model room ceiling fan light kitchen bathroom ceiling bathroom door bathroom ceiling Material Toilet Door Size Toilet Waterproof Price Bathroom Size Toilet Waterproof Material Toilet Ceiling Bathroom Design Toilet Waterproof

Mechanical Uses

Neway Rubber Products Co., Ltd. , http://www.lxrubbers.com

Posted on