Paint construction tips

To buy the heaviest package, lift the paint bucket and shake it. If there is a crackling sound, it indicates that the packaging is seriously inadequate. There are two shortages of the product. The viscosity is too low. The formal factory is real and can hardly hear the sound. .

An estimate of the amount to be used should be purchased at one time to avoid a slight color difference in the purchased paint.

Choose the same brand, primer and topcoat are best to use the same brand or matching paint to prevent the chemical reaction between primer and topcoat.

Construction sequence

1. Remove dust and dirt on the surface of wooden products and lines (wood base).

2. Trimming the burrs on the surface of the wood substrate, lifting the flaws, etc., and polishing with a sand leather to make the corners neat.

3. Use oily putty (or transparent putty) to scrape, polish, refill and putty after putty (when using varnish, first make up brown eyes, nail holes, and do local color repair work).

4. Apply the paint over the first pass, refill the putty, remove the surface dust after polishing.

5. Apply the second pass of the paint. After polishing, remove the surface dust and perform water milling with the sand skin to repair the hanging oil.

6. Apply the third pass of paint until the desired result is achieved.

Wall construction paint