User sums up tips for signing a design contract

1 Agreed design project budget scope to prevent designers from increasing project cost through design, exceeding owners' decoration budget.

2 Appoint the name of the designer designated by the owner, and ask the designer to sign the design work to prevent the professional designer selected by the owner (such as the director-level designer) from transferring the design work or the communication work with the owner to the following general designer. .

3 What are the contents of the agreed full set of design? For example, whether it includes 3D renderings, partial perspectives, node diagrams, kitchen facility layouts, and construction drawings, etc.; what exactly is included in the full set of design drawings, and this book is followed by a special summary.

4 The agreed time and method for designing the payment by installment, such as the payment of 20% on the date of signing the contract, 30% for the initial design, and 50% for the full set of design drawings.

5 The agreed time for the designer's door-to-door measurement is in line with the contractual agreement that “the design time is calculated from the date of measurement” to prevent the design staff from being busy and other reasons to delay the design process.

6 The preliminary design plan shall be completed within a certain number of days after the agreed measurement. The preliminary design plan generally includes a floor layout plan, a top layout plan, a main elevation plan, and a local effect plan. Only after the two parties determine the preliminary design plan can the deep design be entered.

7 In the agreed design process, if the owner makes a major modification to the design, the designer may request that the increase of the design time only apply when the owner makes a major modification to the design plan. This will mainly prevent the designer from delaying the transfer of drawings, and the owner will modify the design in large quantities. .

8 After the agreed design plan is completed, the owner proposes to change the plan. When the drawing completion time is extended and the design plan is completed, the owner must have amendment opinions. During the process of communication and modification, the construction period is postponed. The parties can also agree on the extension of the number of days.

9 After the agreement is amended, if the owner is still dissatisfied with the preliminary design proposal, he may, for example, agree that the owner has the right to request the replacement of the designer and re-implement the preliminary design. If the owner is still not satisfied with the results, he has the right to rescind the contract. The fee will not be refunded, and the drawing owner will be retained.

10 The number of days after the preliminary design plan is finalized, the complete set of design plans shall be finalized based on the time of confirmation of the complete set of design plans by both parties. Both parties shall confirm by signing and stamping.

11 After the agreed full set of design proposals are confirmed, the designers must submit a set of the owners. The company stamps the above to protect the legitimate rights and interests of the owners. The owner must have a complete set of design drawings on hand and must have the company stamped on it. This is only legal. Effective; the two parties handle the sign-off procedures when they are handed over.

12 The appointed designers are obliged to submit the construction plans and make records, and the designers are required to guide the construction personnel not less than three times before going to the site to guide the construction. The designers must explain the problems and precautions in the design to the construction person. During the construction process, the construction site will be instructed on an irregular basis so that the construction can truly reach the design effect.

13 When the design designer has a serious missed item in the design, the design unit must bear the responsibility for breach of contract mainly to prevent the designer from intentionally missing the item in the design. Then the owner signs the decoration construction contract without knowing the situation, and the decoration company will then "Open low and go high" to add items and seek improper interests.

14 The liability for breach of contract that the contractor has not agreed to complete on schedule shall, for example, be stipulated that for each delay of one day, the designer shall bear the penalty of 3% of the total design cost; at the same time, the contractor shall have the right to rescind the design agreement and the delay shall be more than 15 days. Refund of all design fees is required.

15 The appointed design unit shall take full responsibility for the accuracy of the design drawings. If the owner loses due to mistakes in the drawing, the design unit must make a full compensation and make an explicit agreement to strengthen the management of the design unit and the responsibility of the design personnel. Owners defend their rights to preserve evidence.

Decoration contract layout decoration design door renderings kitchen renderings decoration

Mono Calcium Phosphate ,the chemical formula is  Ca (H2PO4)2.H2O, molecular weight of the body is 252.06, after dryed the product is white or slightly yellow micro powder or granules, the relative density of 2.22 (16 Â°C). Slightly hygroscopic, soluble in hydrochloric acid, nitric acid, slightly soluble in cold water, almost insoluble in ethanol. At 30 Â°C, 100 ml of water soluble MCP 1.8g. The aqueous solution was acidic, heating the aqueous solution can get calcium hydrogen phosphate. Lose crystal water at 109 Â°C and decomposed into calcium metaphosphate at 203°C. Applications:Monocalcium Phosphate is used to supply mineral nutrition such as phosphorus (P) and calcium (Ca) for animal, which can be easily digested and absorbed. Extensively applied as additives of Phosphorous and Calcium in aquatic animals feed.Higher water solubility of MCP is required in aquatic animals feed.

Monocalcium Phosphate (MCP)

Monocalcium Phosphate,Mcp Feed Grade,Monocalcium Phosphate Powder,Monocalcium Phosphate Granular

MIDI FEED BIOTECH LIMITED , http://www.midifeed.com

Posted on