Recently, due to the general cooling across the country and bad weather, it has caused inconvenience to the construction of pvc plastic flooring. Customers often require the construction unit to finish the project with quality and quantity, without considering whether the construction conditions are available. In order to better complete the floor construction tasks, it is recommended that everyone must be strictly in accordance with the construction requirements of pvc plastic floor construction in the construction process, can not blindly miss the construction period of construction time, otherwise the loss is incalculable, Bo super warm floor reminder everyone.
Special attention should be paid to the cold period, and the following preventive measures should be taken to avoid the consequences of poor construction:
First, measure the ground temperature at the construction site. It is recommended not to apply below 10°C; during the 12 hours before and after the construction, necessary auxiliary temperature raising measures can be taken to keep the indoor surface temperature at least 10°C; however, the ground temperature requirement cannot exceed 28°C. Self-leveling construction requires water mixing, water temperature is too low (less than 5 °C) will seriously affect the self-leveling strength (not allowed to use self-leveling with warm water mixing), stirring must strictly control the amount of water and mixing time, self-leveling before not drying To ensure that the ambient temperature is above 5°C, check whether the strength of the self-leveling cement should meet the construction requirements after it is completely cured.
2. Before the construction, the adhesive and pvc flooring shall be opened and stored in the construction site with the construction temperature for 12 hours; if the pvc coil (with conditions on the site) is opened as far as possible, the pvc floor will be restored to memory. Due to the influence of temperature, the curing speed of the adhesive is slower; in order to prevent the peeling of the pvc floor and the adhesive after the construction, the pressure roller must be repeatedly pressed to fully adhere.
3. The drying season in winter is about 2-3 times longer than in summer; additional drying period should be maintained for at least 3-4 weeks.
4. Barbaric operations such as slamming are prohibited during transportation and handling.
5. Attention should be paid to the temperature, heat and cold shrinkage of accessories such as treads, beads, and glue.
6. Try to avoid shipments in snow days, and do a good job in anticipating the rain and snow weather may lead to extension of logistics delivery time.
Special attention should be paid to the cold period, and the following preventive measures should be taken to avoid the consequences of poor construction:
First, measure the ground temperature at the construction site. It is recommended not to apply below 10°C; during the 12 hours before and after the construction, necessary auxiliary temperature raising measures can be taken to keep the indoor surface temperature at least 10°C; however, the ground temperature requirement cannot exceed 28°C. Self-leveling construction requires water mixing, water temperature is too low (less than 5 °C) will seriously affect the self-leveling strength (not allowed to use self-leveling with warm water mixing), stirring must strictly control the amount of water and mixing time, self-leveling before not drying To ensure that the ambient temperature is above 5°C, check whether the strength of the self-leveling cement should meet the construction requirements after it is completely cured.
2. Before the construction, the adhesive and pvc flooring shall be opened and stored in the construction site with the construction temperature for 12 hours; if the pvc coil (with conditions on the site) is opened as far as possible, the pvc floor will be restored to memory. Due to the influence of temperature, the curing speed of the adhesive is slower; in order to prevent the peeling of the pvc floor and the adhesive after the construction, the pressure roller must be repeatedly pressed to fully adhere.
3. The drying season in winter is about 2-3 times longer than in summer; additional drying period should be maintained for at least 3-4 weeks.
4. Barbaric operations such as slamming are prohibited during transportation and handling.
5. Attention should be paid to the temperature, heat and cold shrinkage of accessories such as treads, beads, and glue.
6. Try to avoid shipments in snow days, and do a good job in anticipating the rain and snow weather may lead to extension of logistics delivery time.