How to do hydropower renovation decoration hydropower reform design Raiders

Among the various projects in home improvement, the hydropower project is one of the most important projects. At the same time, it is also the place where quality problems and trickery are most likely to occur. If we take care of ourselves a little, we may be cut corners by the decoration company or the workers' masters. There will be many potential safety hazards in the future. What about hydropower reform ? Today Xiao Bian came to share with you the knowledge on how to do hydropower reforms . Let's learn about it together!

How to do hydropower reform

1, circuit transformation

First of all, we talk about the transformation of the circuit, here will be more complicated. Among them, we must pay special attention to the renovation of the double control circuit of the hall light and the setting of the height of the TV socket. During the renovation process, we can set up dual control directly in the hallway with the living room light. This facilitates the lighting of the lights when we enter the door. Other circuit reconstructions are determined by the design, which is usually the transformation of the dining room panel and the living room. The panel of the TV cabinet is remodeled so as to make life-oriented as much as possible, and some unnecessary circuit alterations can be omitted.

2, waterway design

Secondly, the layout of the water pipe is also very heavy. We must set aside its outlet in advance when designing it. For example, in water heaters, toilets, washbasins and shower areas, there are sinks in the kitchen and other places. The installation method of these places must be determined. Whether it needs hot water, if necessary, it should be well thought out in advance. Gas or electric water heaters, to avoid the temporary replacement of water heaters, resulting in repeated alterations to the waterway. In addition to toilets, toilets, washing machines and other water outlets, the toilets should also come out one after the other.

3, washing machine floor drain

There must be a floor drain on the side of the washing machine, but it is better not to use a deep-sea floor drain. This is because the floor leaks slowly. If it is in the shower, it can be used. However, due to the very high drainage speed of the washing machine and the large amount of water discharged, the water discharge rate of the deep water seal leakage cannot be satisfied at all, and it is easy to directly cause the water flow to overflow.

4, under the water pipe noise treatment

In general for the water pipes, we will carry out a sound-proofing treatment. Otherwise, the flow of water going up and down the building will give us a very bad experience. The noise in the living room will also increase. However, if sound insulation is used to treat the sewer pipes with soundproofing cotton, the sound of running water will be greatly reduced and noise will not be affected.

Xiao Bian's words: This part of the project is the top priority of our home improvement, and because it is a hidden project, so we must pay attention to the quality of water and electricity during construction, so as to avoid the life we ​​bring to our own life. Infinite trouble. The above is the relevant knowledge of Xiaobian and everyone to explain how to do the hydropower reform , and hope to give you some reference! More related content, you can pay attention to Qijia information, follow-up will present more exciting content!

How to do hydropower reform

PE Trubler Film

Pe Trubler Film,Poly Clare Film,Plain Continious Film,Plain Hdpe Continious Film

Shaoxing Jiandong Metalware Co.,Ltd. , https://www.laundry-jd.com

Posted on