It is safe to prepare for the construction season in advance.

Plan ahead, start the process, make budgets, keep the order, and do not prepare for renovation before starting work.

Renovated immediately, now. The spring season is the peak season for decoration, and the long-awaited renovation plan is also implemented in this gradual warming season. Before the start of construction, the renovation plan is indispensable, and it is also necessary to pay attention to the safety hazards and the links that are prone to mistakes. From the renovation time, renovation costs, early attention and other matters, we must make a complete plan to ensure the smooth progress of the decoration and perfect closing.

Design planning function in advance

Design planning is an essential part of preparing for renovation. It must be scientifically and rationally designed according to the needs, hobbies and living habits of family members. At the beginning of the design, consumers should focus on how to rationally plan functional areas in a limited space, use space to achieve the living needs of each family member, and decorative design such as color and style can be considered second. After the function is designed, consumers can discuss the decoration style with the designer according to their own preferences.

Hint: Everything is designed from the overall planning. According to the living habits of family members, how to divide the necessary functional areas in the home, determine the location of the outlets and the size of the furniture, etc., have a basic judgment on the infrastructure of the home. In addition, we must also consider changes in family lifestyles in the future. For example, if new homes often have relatives and parents to live, they should also take into account their living habits; if there are pregnant women or babies in the future, consider the location of the crib. The subtle problems of room color.

Schedule the time process

After the design of the renovation is over, the formal construction phase begins. According to the layout plan and construction drawing of the designer after the measurement room, consumers can choose all-inclusive and half-package. “Half-package” means that consumers buy ceramics, flooring, cabinets, bathrooms, lamps and other main materials. The construction sequence of the decoration is generally hydropower transformation, bricklayer (laying ceiling, paving wall tile), woodwork (making and installing custom furniture), oiler (wooden painting, brushing wall paint), then installing the main material, Furniture appliances entered the market.

Tip: The most common decoration regret is that the number of outlets is not enough or the position is not right, the reserved position of the water pipe is inconvenient, etc. These hidden dangers should be avoided as soon as possible, otherwise it will become a “side-by-side repair”.

Do a good job budget

Choosing the "all-inclusive" decoration mode, consumers are more labor-saving, but the cost is relatively high; choose the "semi-package" decoration mode, you can buy the main material or even the auxiliary materials from the building materials market, but need to have enough time and patient. In addition, the selection of the renovation team construction, rather than the choice of home improvement company to save part of the management fees, taxes, but there is a danger of poor use of materials, construction quality is not critical, consumers must weigh the pros and cons when choosing.

Tip: During the construction process, hydropower often occupies most of the cost, because each household has different conditions and costs are different. Because many companies do not give detailed quotations before construction, it is also easy to generate additional items. In fact, if the measurement is accurate and the construction process is skilled, the estimated cost can be estimated in advance. It is best for consumers not to follow the “estimate”. It must be measured together with the construction personnel to prevent the final bill from “changing the face”.

Pay attention to the retention slip

The decoration process is complicated and changeable. When consumers purchase and purchase the main materials, they should pay attention to the documents kept, including the decoration contract signed with the decoration company, the wiring diagram of the water and electricity lines, the inspection report of the main material and auxiliary products, and each cost. Receipts or invoices, etc., on the one hand, to protect their legitimate rights and interests when disputes arise, on the other hand, if documents need to be repaired and later, these documents are also necessary guarantees.

Tip: The decoration should choose qualified construction units and design units. If the decoration is contracted to the construction team, the specific information of the construction personnel of the other party and the contractor's company information should be retained, and the sample of the decoration contract should be downloaded from the Beijing Municipal Administration for Industry and Commerce, and the construction contract should be signed with the other party to constrain the rights and obligations of the other party. When signing a contract, attention should be paid to the details of the material quantity fee list, acceptance contract, supervision organization, and test report standards.

Do a good job of saving money

"How much money can be done?" Before the renovation, consumers should run the building materials market, check the information such as the decoration diary on the Internet, and have a certain understanding of the price, material and dosage of the main material; during the renovation process, resist the " The temptation of the decoration style of others or the dissuasion of the designer and the foreman to spend money on practicality.

Tip: From March to May every year, merchants will choose to carry out large-scale promotion, group purchase activities, home exhibitions are also more intensive, consumers can pay attention to this detail, through discounts, group purchases and other information to buy benefits. Brand-intensive group buying exhibitions can also achieve one-stop shopping, saving time and energy.

[Expert reminder]

Hydropower projects need to be taken care of

●Cui Tao, current director of decoration engineering

Hydropower transformation is a complex concealed project. Some non-standardized teams use consumers who do not understand, and will make indiscriminate leads and shoddy behaviors. Before construction, consumers should plan according to their own needs. After the start of construction, consumers should be diligently go to the construction site to check. Before the electrical pipelines are unsealed, workers are required to draw a wiring diagram for future maintenance.

The number of socket interfaces needs to be considered in advance.

●He Hanfei, Manager of Quality Inspection Department of Shichuang Decoration Group

Before the renovation, the existing socket panel interface of the house is generally reasonable. In fact, the number of consumers is increased by three or four. Some strong and weak electrical outlets in key locations should be thought of in advance. The balcony, storage room, bathroom toilet, and basin are the corners that need to be focused on. The final cost of the circuit transformation is less than 10% of the budget. If the decoration is completed, the cost is definitely higher than expected.

â–  Practical tips

For the convenience of comfort

Every home is renovated once, maybe it will be reloaded after ten years, so try to consider comfort when decorating. For example, the mop head water pipe is provided with a hot water pipe for use in winter; a floor drain is installed on the balcony as much as possible to reduce the humidity space; before installing the toilet, you can consider adding a power supply next to it to facilitate the installation of the body cleaner. In addition, it is necessary to leave enough space for storage and to ensure the comfort of storage.

The remaining materials become waste

After the renovation is basically completed, there will often be some building materials remaining, which can be used in various ways to dress up the home. For example, the remaining tiles can be arbitrarily cut and then spliced ​​to make a mosaic shape or other pattern; the remaining good quality, strong sacks can be used as flower pots, sewing bags, curtains, etc. after cleaning; the remaining plates can be Do your own bookshelf or flower stand, strong and practical. Beijing News reporter Feng Jing

Diaphragm For Joil Pulse Valve

The category of diaphragm for JOIL pulse valve. The diaphragms are listed as follows:


BRANDO Diaphragm Model
Pulse Valve Port Size
Pulse Valve Model
Diaphragm Material
JTY (Secondary Diaphragm) 1 1/2'' to 4'' All Double Diaphragm Pulse Valves
NBR, FKM
J20
3/4''
JICI20, JICR20,
JISI20, JISR20
J25
1''
JICI25, JICR25,
JISI25, JISR25
J40 & JTY
1 1/2''
JICI40, JICR40,
JISI40, JISR40,
JIFI40, JIFR40,
JIHI40, JIHR40
J50 & JTY
2''
JISI50, JISR50,
JIFI50, JIFR50,
JIHI50, JIHR50
J65 & JTY
2 1/2''
JISI65, JISR65,
JIFI65, JIFR65,
JIHI65, JIHR65
J80 & JTY
3''
JISI80, JISR80,
JIHI80, JIHR80
J100 & JTY
4''
JIHI100, JIHR100

Joil Pulse Valve Diaphragm, Joil Pulse Valve Membrane, Joil Diaphragm, Joil Membrane

NINGBO BRANDO HARDWARE CO.,LTD , https://www.brandopneumatic.com

Posted on