Pay attention to these so that your home is no longer overspend

Consumers must look at the construction drawings in detail in comparison with the renderings, and pay attention to the following aspects: whether the position of the demolished wall is changed, whether the style of the furniture is consistent with the renderings, whether the brick surface is diagonal or flat (tilted and flat) Different paving methods, prices are not the same), which place to do ceiling and so on.


Gusi mattress    Concave still home flagship store

In the course of the increase, it is unavoidable, but often the decorating project always makes the decoration overspend, and the decoration cost has never been saved. If the total price is excessive, it will easily lead to consumer dissatisfaction.

In order to quickly sign the bills, the designers use the weaknesses of the consumers, such as lack of professional knowledge, total price, lack of comparisons, etc., and they deliberately missed items or made no explanation for the situation. In this way, it is easy to overspend in the mid-term of the project, and consumers are forced to survive even if they are angry.

First, easy to overspend the project

1. The hydropower reform is expected to be low

The status of hydropower reform in modern decoration is quite important, and slight changes in expenditure may increase significantly. "If it is a new house, there will be very few water circuit reforms, and it will cost 3,000 yuan." The hydropower reforms on the quotations are basically estimated expenses, which are called duotues and supplements, but it is fortunate that they can make up for less. . “Actually, changing the cost of water and electricity is the easiest to change.” Most consumers do not understand the construction specifications, and it is easy to take it for granted that designers rarely help consumers to carefully calculate expenses for signing orders.

“Even if you move a switch or socket, this seemingly simple action will increase the cost of circuit reconstruction.” If you add a switch on the opposite wall, many consumers will take it for granted, “but only three or five meters. Well". "But in reality, most of the circuits are winding."

In order to avoid circuit splicing, a short circuit change in the eyes of consumers is likely to go from the wall to the ceiling, through the ceiling, and then to the opposite wall. This distance is about three times more than imagined, and the cost will be much higher. The designer said that consumers are most likely to make mistakes and think that "how does it look like?" and this is also easily used by eager designers. “Hydropower reform can easily become the big head of budget overruns, and it’s very likely that there’s more than a million yuan.”

2, can leak to do a low total price

In the process of the designer's hands and feet, the most common method is to miss. “In order to approach the customer’s affordability, some designers missed out what they could leak. Some small items easily overlooked by consumers can save the province. As for consumers, the unexpected cost is not mentioned.” ) Holes to find the "project. Most people now purchase finished products. However, due to construction and other reasons, many new house door openings will have cracks in the entrance line, up and down, etc., and the finished product door cannot be directly installed. Therefore, the door opening needs to be handled before installation. A three-room, two-room house, if you want to find the door and find the side, you need to spend 2,000 yuan more.

According to the designer, most new houses need to be searched for openings first, but the average consumer does not know this item and quotations are rarely involved. Well, when you install the door, you will certainly not think that you will have to spend so much more. There are also baseboards of different materials, such as baseboards, and the installation price is not the same, and even varies greatly.

3, the price is not the same as the effect chart

The quotation reflects the basic decoration price, and the effect map shows the expected effect after the renovation. Consumers often think that the quotation sheet corresponds to the content on the rendering. It may not be discovered until after construction that the key materials for the effect actually need to be purchased. For this, some designers do not explain in advance, and in order to achieve results, most consumers have to be forced to accept the reality and increase the budget. For example, in the understanding of the average person, the production of a wardrobe must include a cabinet, a cabinet door, and a finished wardrobe that can be used directly. "But it's just the cabinets that make it happen. Consumers need to pay for their own cabinets."

Not convinced? Look back at the quotation. The budget book is really about "the cabinet structure." At this point, consumers can complain besides complaining that they have not read the quotation. “The ceiling is the same, and the designer has produced a very beautiful glass ceiling or wood ceiling.” Most people will think that the ceiling price is the price of the entire ceiling in the renderings.

In actual fact, when the construction is in the middle period, workers will tell you that you need to buy glass or wood ornaments yourself. Do not believe that you look at the quotation. Only the most basic wooden keel and gypsum board price is in the quotation. There is really no glass or wood. To decorate the price, if you want to pursue the ceiling in the rendering, then pay for it. Or, the designer gives you a rendering of a curved ceiling, but in order to control the total price, some designers will write the price of a plane ceiling on the quotation, and it is difficult for consumers to see the clues.

Because the curved ceiling is much more worn than the flat ceiling, the price is much different. Want to achieve the effect, add money.

4, special effects increase spending

The quotation included the price of the wall paint, but in fact more than three colors, including white, would require additional money. And some of the effects of ordinary painting can not be done at all, such as changing other brushing methods, have to save money. Other designers themselves lacked construction experience and theoretical knowledge. The survey site was not detailed. When the project was implemented, it was considered that there was no deepening or luck. This could have caused an increase in the medium term. For example, in the design of wood styling or other shapes, such as tables, tables, wardrobes, etc., for the sake of aesthetics and complete composition, designers often use large areas of arc processing and segmentation, but in reality, it may be because the span is too large and the support is not enough. can not achieve.

Or the suspended ceiling of the living room corridor, due to the absence of consideration of the beam's location or scale, will cause the original plan to be implemented and the design needs to be changed. In order to achieve special effects, it may be necessary to purchase additional supports or change materials, resulting in increased costs.

In order to prevent changes in the middle and later stages, while looking at the quotation, consumers should also pay attention to the construction drawings, including layout plans, water circuit renovation plans, floor tiles, and ceiling charts. Many consumers do not care about drawings, and they sign it.

However, once signed, it expresses its approval of the practice on construction drawings. If the designer intends to change it, consumers will be very unfavorable.

Therefore, consumers must look at the construction drawings in detail in comparison with the renderings, and pay attention to the following aspects: whether the position of the demolished wall is changed, whether the style of the furniture is consistent with the rendering, and whether the brick surface is slanted or tiled (beveled) Different from tile paving, the price is not the same), which position is the ceiling, etc.

Renovation Budget Knowledge Notes Villa Design Ceiling Effect Picture Door Price Door Effect Picture Decoration Design New House Plasterboard Ceiling Ceiling Price Decoration Ceiling Effect Picture Three Room Two Room Decoration Effect Picture New House Decoration Effect Picture Corridor Decoration Effect Picture Decoration Living Room Home Decoration Effect Picture House Decoration Effect Picture Glass Brick Glass Door Glass Furniture Doors White Furniture Glass Table Glass Doors Doors Decoration Home

1. Technical standard: BS EN 10202, DIN EN 10203, GB/T2520 , JIS G3303
2. Steel type: MR, SPCC
3. Thickness: 0.115 - 0.50 mm
4. Width:  600 - 1050 mm
5. Length: 600-1200mm

Tin Coating: ordinary 2.8 or 2.8g and 5.6g or 5.6g, we can produce according to customer's requests

Guolian New Material can produce full range of tinplates together with other tinplates services. Like tinplate sheets and coils are very popular in the European, like Finland, Italy and France, etc- Laminated Tinplate are also selling well in Middle East like Saudi Arabia and United Arab Emirates. So, different tinplate products can meet different countries customer`s demand.  With care and responsibility, Guolian will keep pursuit of excellent and high quality products, and we believe it will bring larger and better markets for our customers.

Tfs Crown Cork

Tfs Crown Cork,Crown Cap,Beer Bottle Lid,Bottle Cover

Jiangsu Guolian New Material Co., Ltd. , http://www.cntinplate.com

Posted on