An integrated ceiling what time is appropriate to integrate ceiling installation should pay attention to what

General integrated ceiling kitchen and bathroom installed more selected integrated ceiling installation is very simple, and very beautiful, but Anji Cheng ceiling What time is it appropriate? Integrated ceiling installation need pay attention to what? Anji Cheng ceiling decoration knowledge, the following small series will For your detailed introduction, then everyone below to learn about it together!

What time is suitable for integrating the ceiling ?

1. The kitchen ceiling installation time: To do a good job in the mud project, the tiles can be installed after the ceiling can be installed. However, if the kitchen does not install a whole cabinet, then the woodworker who waits for the cabinets will install the ceiling. If the construction period is not tense, it can also wait for the paint to be installed on the ceiling, which is more hygienic.

2. The installation time of the ceiling of the bathroom: The precise installation of the bathroom is in the order of the ceiling. The forecast is followed by the fan and then the ceiling is suspended. When installing the Yuba and the electric fan, it must not be screwed directly on the aluminum buckle plate, and it must be fixed to the concrete on the top with shrink bolts.

3. Measuring the time of the integrated ceiling: After installation of the hydropower and tile works, the ceiling can be measured.

Integrated ceiling installation need to pay attention to what

1. Take care to prevent moisture. When installing integrated ceilings in the kitchen and toilet areas, care must be taken to prevent moisture.

2. Plates should be placed flat when transported. When the integrated ceiling is transported and stacked, it is very easy to bend and deform if it is not placed flat. Therefore, it must be adhered to whether the integrated ceiling is bent or not when unloading. In addition, the storage of integrated ceiling should avoid the erosion of high temperature and harmful substances, as well as the installation of an orderly insert according to size, not hard plug, to prevent deformation.

3. Overhaul when installing integrated ceiling appliances. If the ceiling is used with a concealed frame, it must be provided with manholes. If no manholes are provided, it will be difficult to check specific causes and problems if there are problems with the equipment. It is difficult to repair. Therefore, it is advisable to lay the ceiling of the pipeline or to set up the inspection hole. The setting can be set in a concealed position and then be modified so that it is not difficult to read.

4. Can not ignore the acceptance process. Every process of decoration, every environmental acceptance can not be neglected, especially the bathroom ceiling, is a very important environment, if not dealt with will occur more kitchen soot, bathroom heavy smell and so on.

Article Summary: content above description is about the right time Anji Cheng ceiling, as well as some notes integrated ceiling installation. With regard to these decoration knowledge, Xiaobian was introduced and provided for everyone's reference and study. I hope the above-mentioned content can provide some help for everyone.