The correct pavement makes the floor without regrets 5 ways to prevent and construct

The emphasis on decoration is the overall coordination, unity, and appearance. In order to achieve the ultimate decoration effect, some jobs require your own expenses.


Beautiful Island solid wood floor Zhengge floor

Unfortunately, the ground treatment is not flat

It is prone to problems: If floors are laid on uneven ground, unevenness may occur behind the installed floor, and there is a large gap between the foot line and the floor. This not only affects the appearance, but also affects the service life of the floor lock, and even causes Floor noise.

Correct prevention and construction methods: During the renovation, the ground should remain flat and the height difference within 2m should be less than 5mm.

Regret 2: The pipeline is not clear

It is prone to problems: If the laying of pipelines in various rooms is not clear, it is easy to break the pipeline when installing the floor, and thus to re-maintain the pipelines, to waste time and increase trouble.

Correct prevention and construction methods: Present the pipelaying drawings to the installer or mark the pipeline before installing the floor.

Regret 3: Height difference between floor and floor tiles

It is prone to problems: Some customers' living room and room pavement will be floor tiles and floors, respectively, but floors and floor tiles will appear after the level difference, affecting the appearance.

Correct prevention and construction methods: Ask the professional installer to know the thickness of the floor before paving the floor. Some ground leveling or keel laying is done according to the laying thickness.

Regret 4: Door cover

It is prone to problems: After the door-sleeve is installed, if the door seam is not reserved according to the height of the floor paving, the door-sleeve will need to be cut when paving the floor, which may cause the door cover to have burrs or paint collapse.

Correct prevention and construction methods: When the door cover is installed, contact the flooring company in advance to reserve the required height for the floor covering.

Regret 5: The choice of geothermal floor

It is prone to problems: In a geothermal environment, failure to lay the floor correctly or to use geothermal heat in the correct way may cause damage to the floor.

Correct prevention and construction methods: First, choose the correct geothermal floor, the most suitable is the multi-layer solid wood floor, followed by the strengthening of the floor, solid wood is not suitable for geothermal environment. The second is that geothermal heat rises 5 degrees a day during initial use. Third, if the new type of geothermal pavement, geothermal companies to inform the floor pavement considerations.

Links: Analysis of Common Disorders in Floor Pavements

Flooring room paint decoration living room floor tiles

Dutch Wire Mesh

Dutch Wire Mesh, Dutch Wire Mesh -1, China Dutch Wire Mesh

Anping County ShunXing Hardware Wire Mesh Co., Ltd. , http://www.shunxing-fence.com